am trying to compare two different techniques for assigning resources to
projects. I have created a simple simulation but currently have to solve
it manuallly and would like to automate it in xcel so I can change
parameters.

The assumptions are that there are 9 projects each with different
optimal sizes (averaging 8) and expected durations (Averaging 1 month).
Ultimately I want to know which models complete the 9 projects in the
quickest time under differnt conditions and what the resource
utilization rate is.

In one structure you have three teams of 8 people each working on the
same, single proejct. As soon as that proejct is done they start the
next one. If the ideal size is less than the 8 people on the team the
extra people contribute .25 to the output.

In the other structure you have 24 indiivudal assigned to projects
based on their optimal size and kept on the project for its duration. A
project can only start when it has a full compliment of people assigned
to it.

I would like to automate it so I can adjust project size asusmptions
and also introduce uncertainty (i.e. the likelihood that a project will
exceed its expected duration).

Any ideas on how to contruct this in excel?

Thanks,
Avi--
avalpert
------------------------------------------------------------------------
avalpert's Profile: www.excelforum.com/member.php...oamp;userid=32378
View this thread: www.excelforum.com/showthread...hreadid=521404

arrow
arrow
    全站熱搜
    創作者介紹
    創作者 software 的頭像
    software

    software

    software 發表在 痞客邦 留言(0) 人氣()