I'm making a db with 1 linked sheet (K), connected to an principal one (P1).
I want to do this:
- Dec 25 Tue 2007 20:41
Linked sheets with sequencial order in 2º Sheet
- Dec 25 Tue 2007 20:41
What is the difference between split screen and freeze?
I use freeze quite often, but not the split screen. When would this be
beneficial to me? I don't really understand its uses. Thank you!
- Dec 25 Tue 2007 20:41
Having footer reflect date of last edit/revision?
Hi there,
- Dec 25 Tue 2007 20:41
How to execute Macros through Text Links?
Hi There,
- Dec 25 Tue 2007 20:41
Excel should treat windows independently like Word.
Excel frustrates me to no end with the way it closes down all occurrences of
Excel. This is different from the way Word behaves.
- Dec 25 Tue 2007 20:41
Pivot Table
When I change the criteria in my pivot table the columns default back to the
original column width. Is there a way to set the column width at the start
- Dec 25 Tue 2007 20:41
About Sheets
If I have to delete Sheet 1 from a file than can I recover the same sheet
before saving?
- Dec 25 Tue 2007 20:41
I cannot get on-line, using road runner.
Can someone help me with this?
- Dec 25 Tue 2007 20:41
Help with Formulae please!
- Dec 25 Tue 2007 20:41
Can excel macro access SUBstring individual 'char' level? If so how?