I am doing a study of the time it takes to process a form. The form goes
through three stations. I have quot;total time to processquot; at the end. I would
like to add these times and determine an average time to process a form. How
is this done? I have tried different formatting with no success. I am using
Office 2003.

=average(a1,b3,c9)
or
=average(a1:a3)

You may want to format the cell as: [hh]:mm:ss
Matt75 wrote:
gt;
gt; I am doing a study of the time it takes to process a form. The form goes
gt; through three stations. I have quot;total time to processquot; at the end. I would
gt; like to add these times and determine an average time to process a form. How
gt; is this done? I have tried different formatting with no success. I am using
gt; Office 2003.

--

Dave Peterson