I'm setting up a trip spreadsheet and would like to include a column to
estimate expected time to travel. I have a column for distance from Point A
to Point B. What I'd like to do is be able to divide by my expected rate of
travel (72 mph) to determine expected time from A to B. I'd also like to
have a second column that shows cumulative time from the beginning of the
trip.
Ohio,
You could set up your sheet as follows:
column titles:
A | B | C | D
Description | Distance (miles) |Est Time | Running Total
So, in A2, you would enter your text for quot;City 1 to City 2quot;. Continue down
column A for each leg of your journey.
In B2, you would enter the distance between them quot;500quot; (don't add any text
like quot;milesquot;). Continue down column B, entering the distances for each leg.
In C2, you would enter the formula =B2/72. Click on cell C2, and fill down
that formula to the end of your list.
In cell D3, enter the formula =D2 C3 and fill that down to the end of your
list.
Happy Trails!
Heidi
quot;OhioSnowBird13quot; wrote:
gt; I'm setting up a trip spreadsheet and would like to include a column to
gt; estimate expected time to travel. I have a column for distance from Point A
gt; to Point B. What I'd like to do is be able to divide by my expected rate of
gt; travel (72 mph) to determine expected time from A to B. I'd also like to
gt; have a second column that shows cumulative time from the beginning of the
gt; trip.
- Feb 22 Thu 2007 20:35
How to use miles per hour and mileage to estimate travel time
close
全站熱搜
留言列表
發表留言