I'm a handyman who works on many apartments and homes and many little
projects within those places. I need to let the real estate firm know what I
did and how long it took to do it. I need to put together a time sheet
showing what time I started a project and what time I ended that project. A
column with the total number of hours and minutes after that. A total number
of hours and minutes at the bottom of that column. And a total cost for the
hours worked. I need a column with description of what I did and then at the
very bottom a total for the entire job. Does anyone have any idea how I can
do this? I've tried and failed miserably, and I thought I was pretty
advanced in the use of Excel! So now I ask, rather, beg for help. Anyone????
Just put the times like start 08:00 AM end 05:00 PM for instance in A1 start
and B1 end
then
=B1-A1then total at the end of the week or whenever
=SUM(C1:C5)format as [hh]:mm
then finally multiply with 24 and the payrate
=C2*24*Pay_Rate
and format as currency or general--
Regards,
Peo Sjoblom
nwexcelsolutions.com
quot;Tom DiBellquot; lt;Tom gt; wrote in message
news
gt; I'm a handyman who works on many apartments and homes and many little
gt; projects within those places. I need to let the real estate firm know
gt; what I
gt; did and how long it took to do it. I need to put together a time sheet
gt; showing what time I started a project and what time I ended that project.
gt; A
gt; column with the total number of hours and minutes after that. A total
gt; number
gt; of hours and minutes at the bottom of that column. And a total cost for
gt; the
gt; hours worked. I need a column with description of what I did and then at
gt; the
gt; very bottom a total for the entire job. Does anyone have any idea how I
gt; can
gt; do this? I've tried and failed miserably, and I thought I was pretty
gt; advanced in the use of Excel! So now I ask, rather, beg for help.
gt; Anyone????
- Apr 21 Sat 2007 20:36
How can I add hours and minutes then multiply by cost per hour?