close

I have a 1500 row by 36 column spreadsheet. I link in three different
spreadsheets (each representing approximately 25% of the columns). Two files
link fairly quickly (30 seconds or so). The third file takes 5-7 minutes.
How can I improve the performance of the linking process? The three external
files are all on the same network folder.


I've found that performance is much quicker when the linked files are
open at the same time

Regards
Mike--
Mikeopolo
------------------------------------------------------------------------
Mikeopolo's Profile: www.excelforum.com/member.php...oamp;userid=18570
View this thread: www.excelforum.com/showthread...hreadid=530338I'd open the files, too.

Or move them to a local folder on my harddrive.

Using formulas to enter NULL cell values wrote:
gt;
gt; I have a 1500 row by 36 column spreadsheet. I link in three different
gt; spreadsheets (each representing approximately 25% of the columns). Two files
gt; link fairly quickly (30 seconds or so). The third file takes 5-7 minutes.
gt; How can I improve the performance of the linking process? The three external
gt; files are all on the same network folder.

--

Dave Peterson

arrow
arrow
    全站熱搜
    創作者介紹
    創作者 software 的頭像
    software

    software

    software 發表在 痞客邦 留言(0) 人氣()